MUNICIPAL AND GOVERNMENT

Hillsborough County
Water Resources Division
- Valrico AWTP Expansion • The Valrico Advanced Wastewater Treatment Plant (AWTP) was expanded from 6.0 to 12.0 MGD and included the additions of an Ultraviolet (UV) Disinfection system and a Reclaimed Water Pumping Station. Engineering services provided consisted primarily of Civil / Structural engineering. Engineering work included an assessment of the existing structures conditions, headwork’s modifications liner and structural integrity evaluations, foundation modifications, reinforced concrete structures for storage tank support, oxidation ditches, the influent splitter box, clarifiers, filter structure, pump stations, UV system, chlorine concentrate tanks, and the Sodium Hypochlorite and Alum Feed systems. Additional scope consisted of miscellaneous concrete slabs, an Electrical building, elevated concrete tank support floors, piles and pile caps, reinforced CMU walls and steel truss design, concrete trenches, a structural steel canopy, aluminum gratings, walkways, stairs and pipe supports, spread footings, slabs, pump foundations, and a 2.5-ton monorail.

Hillsborough County
Water Resources Division
- Lithia WTP Pump Capacity • Lithia WTP Pump Capacity • Provided full Engineering and Procurement services for the installation of additional potable water pumping capacity and an emergency backup generator at a municipal facility. Project scope included installing Variable Frequency Drives (VFD) on the new, 25,000 gpm, as well as replacing existing pump drives with VFD’s. Tasks included current and projected water use determination, expansion options development and cost estimates, equipment specification and test run observation, and water quality compliance and acceptance participation.

Hillsborough County
Water Resources Division
- Falkenburg AWTP Expansion • Civil, Structural, Instrumentation and Electrical engineering services were provided for the expansion of the Falkenburg AWTP from 6.0 to 9.0 MGD, the South / Central Pumping Station addition and the Telemetry Improvements projects near Tampa, Florida. With a final installed cost of $11.4M, both project design and construction was completed on time and on budget. The project included the addition of new treatment facilities, pumps, 5 M gal storage tank, and SCADA system improvements for the entire facility (distributed control via PLC’s located throughout the facility) and the South / Central Service Area. As a subcontractor, services included electrical and instrumentation Construction Support, Shop Drawing reviews, engineering field observations of construction work and facility start-up.

City of Tampa - HAZOP Analysis • Metzger and Willard Inc. (MWI) and PegasusTSI, Inc have been selected to facilitate a complete hazard analysis for the City of Tampa on The David L. Tippin Water Treatment Facility located in Tampa, Fl. The hazard analysis is being done by the City of Tampa, to ensure continued safe operation of the Tippin Water Treatment facility. The hazard analysis will consist of: (1) A walkdown of the systems to become familiar with the layout and safety systems. (2) A review of the operations at the Tippin plant as well as similar facilities. (3) A review of any potential hazards associated with the siting of equipment in the facility. (4) A review of human factors which could result in a safety incident. (5) A review of each pipe and piece of equipment in the system to identify any scenarios which could lead to a release of either chlorine or ammonia to the atmosphere.


 