Home  >  Project Highlight  >  Consumer Products

CONSUMER PRODUCTS

Philip Morris - Export Cut Filler • A $20 million installation of a cigarette cut filler manufacturing operation involving 20 major pieces of equipment, 150 tons of steel, complete DCS/PLC automation and Systems integration. EP services included Detailed Engineering, Procurement and Construction Support.

Celotex (now CertainTeed) - Wallboard Waste Reclaim Retrofit • Engineering services for the 12 TPH, reclamation project involved the design and configuration of major equipment including crusher, knife hog, storage bins, belt/screw conveyors, bucket elevators, volumetric feeders and a dust collection system.

Celotex (now CertainTeed) - Ceiling Tile Plant Automation • A completely automated Control System design and configuration was provided as part of the Engineering and start-up support services. The system, based on Allen Bradley PLC, provided control of 3 tenoners, a paint booth, a drying oven, a packaging machine (shrink-wrap), Conveying System, and 23 Variable Frequency Drives.


 
  Sitemap  |  Login              Copyright 2013, PegasusTSI, Inc